产品应用与封装尺寸

图纸取自原厂规格书,点击可放大查看原始尺寸标注。
关键参数速览
- 反向电压 VR
- 5 V
- 正向电流 IF
- 1.25
- 隔离电压 VISO
- 500 V DC
产品特点 Features
- 4.3 4.4
- CCAADD DDaattaa mm inch
- TYPES
- Output rating*
- Load Load voltage current
- 60V 500mA
- AC/DC
- 350V 120mA dual use
- 400V 100mA
- Indicate the peak AC and DC values.
- closed-circuit offset voltage to enable • Measuring and testing equipment control of low-level analog signals without • Factory automation equipment distortion. • Security equipment
- 2. Small SOP4-Pin package • High speed inspection machines
- The device comes in a miniature SOP4- pin type measuring (W)4.3 (L)4.4
- (H)2.1 mm (W).169 (L).173 (H).083 inch
- 3. Low-level off state leakage current of max. 1 A
- 4. Load voltage 60V, 350V and 400V types available
绝对最大额定值 Absolute Maximum Ratings(TA = 25°C)
超过下表数值可能造成器件永久损坏,设计时请留余量。
| 符号 | AQY212S | AQY210S | AQY214S | 备注 |
|---|---|---|---|---|
| IF VR | 50 mA 5 V | |||
| IFP Pin | 1 A 75 mW | f = 100 | Hz, Duty factor = 0.1% | |
| VL | 60 V | 350 V | 400 V | |
| IL | 0.5 A | 0.12 A | 0.1 A Peak | AC, DC |
| Ipeak Pout PT | 1.5 A | 0.3 A 300 mW 350 mW | 0.24 A 100ms | (1 shot), VL = DC |
| GU | SOP 1 Form | A (AQY21S) | ||
| 4. Turn off time vs. ambient temperature | 5. LED operate | current vs. ambient | 6. LED turn off | current vs. ambient |
| Continuous load current: Max. (DC) | Continuous load | current: Max. (DC) | Continuous load | current: Max. (DC) |
| sm | ,tnerruc | ,tnerruc | ||
| ffo nruT | etarepo | ffo nrut | ||
| 0 | 0 | 0 | ||
| -40 -20 0 20 40 60 | 8085 -40 -20 | 0 20 40 60 8085 | -40 -20 | 0 20 40 60 8085 |
| Ambient temperature, | °C | Ambient temperature, °C | Ambient temperature, °C | |
| temperature characteristics | output at MOS | portion | output at MOS | portion |
| Ambient temperature: | 25C 77F | Ambient temperature: | 25C 77F | |
| Am 100 AQY210S | ||||
| V ,egatlov 1.4 | ,tnerruC 80 AQY214S 60 | A 0.4 AQY212S | ||
| 1.2 | -5 | -4 -3 -2 -1 | -1 | -0.5 |
| 50mA | 1 2 3 4 5 | 0 0.5 1 | ||
| DEL | 30mA | -20 Voltage, V | Voltage, V | |
| 1.1 | 20mA 10mA 5mA | -40 -60 -100 | -0.2 | |
| -40 -20 0 20 40 60 | 8085 | -0.6 | ||
| 9. Off state leakage current vs. load | voltage 10.Turn on time | vs. LED forward current | 11.Turn off time | vs. LED forward current |
| Ambient temperature: 25C 77F | Load voltage: Max. | (DC); Continuous load current: AQY212S | Load voltage: Max. 0.10 | (DC); Continuous load current: |
| egakael 10-6 | ,emit 0.8 | ,emit 0.08 | ||
| etats 10-9 ffO | nruT 0.6 0.4 | ffo nruT 0.06 | AQY214S AQY210S | |
| AQY214S, AQY212S | AQY210S 0.2 | |||
| AQY214S, AQY210S | ||||
| 0 20 40 60 80 | 100 0 0 10 | 20 30 40 50 60 | 0 | |
| 0 10 | 20 30 40 50 60 | |||
| Load voltage, V | LED forward current, mA | LED forward current, mA | ||
| Measured portion: between terminals 3 | and 4; | |||
| Frequency: 1 MHz; Ambient temperature: | 25C 77F | |||
| 0 10 20 30 40 | 50 | |||
| ds_x615_en_aqy21s: 011212J | 3 |
数据来源:原厂规格书
安全与绝缘额定值(DIN EN/IEC 60747−5−5)
| 特性 | temperature | 特性2 | temperature2 | 特性3 |
|---|---|---|---|---|
| GU | SOP 1 Form | A (AQY21S) | ||
| 4. Turn off time vs. ambient temperature | 5. LED operate | current vs. ambient | 6. LED turn off | current vs. ambient |
| Continuous load current: Max. (DC) | Continuous load | current: Max. (DC) | Continuous load | current: Max. (DC) |
| sm | ,tnerruc | ,tnerruc | ||
| ffo nruT | etarepo | ffo nrut | ||
| 0 | 0 | 0 | ||
| -40 -20 0 20 40 60 | 8085 -40 -20 | 0 20 40 60 8085 | -40 -20 | 0 20 40 60 8085 |
| Ambient temperature, | °C | Ambient temperature, °C | Ambient temperature, °C | |
| temperature characteristics | output at MOS | portion | output at MOS | portion |
| Ambient temperature: | 25C 77F | Ambient temperature: | 25C 77F | |
| Am 100 AQY210S | ||||
| V ,egatlov 1.4 | ,tnerruC 80 AQY214S 60 | A 0.4 AQY212S | ||
| 1.2 | -5 | -4 -3 -2 -1 | -1 | -0.5 |
| 50mA | 1 2 3 4 5 | 0 0.5 1 | ||
| DEL | 30mA | -20 Voltage, V | Voltage, V | |
| 1.1 | 20mA 10mA 5mA | -40 -60 -100 | -0.2 | |
| -40 -20 0 20 40 60 | 8085 | -0.6 | ||
| 9. Off state leakage current vs. load | voltage 10.Turn on time | vs. LED forward current | 11.Turn off time | vs. LED forward current |
| Ambient temperature: 25C 77F | Load voltage: Max. | (DC); Continuous load current: AQY212S | Load voltage: Max. 0.10 | (DC); Continuous load current: |
| egakael 10-6 | ,emit 0.8 | ,emit 0.08 | ||
| etats 10-9 ffO | nruT 0.6 0.4 | ffo nruT 0.06 | AQY214S AQY210S | |
| AQY214S, AQY212S | AQY210S 0.2 | |||
| AQY214S, AQY210S | ||||
| 0 20 40 60 80 | 100 0 0 10 | 20 30 40 50 60 | 0 | |
| 0 10 | 20 30 40 50 60 | |||
| Load voltage, V | LED forward current, mA | LED forward current, mA | ||
| Measured portion: between terminals 3 | and 4; | |||
| Frequency: 1 MHz; Ambient temperature: | 25C 77F | |||
| 0 10 20 30 40 | 50 | |||
| ds_x615_en_aqy21s: 011212J | 3 |
电气特性 Electrical Characteristics(TA = 25°C)
| 项目 | 符号 | AQY212S | AQY210S | AQY214S | 备注 |
|---|---|---|---|---|---|
| Typical | 0.9 mA | ||||
| LED operate current | IFon Maximum | 3 mA | IL = Max. | ||
| Minimum | 0.4 mA | ||||
| Input LED turn off current | IFoff | IL = Max. | |||
| Typical | 0.85 mA | ||||
| Typical | 1.25 | V (1.14 V at IF = 5 | mA) | ||
| LED dropout voltage | VF Maximum | 1.5 V | IF = 50 mA | ||
| Typical | 0.83 | 17 | 25 | IF = 5 mA | |
| On resistance | Ron | IL = Max. | |||
| Output | Maximum | 2.5 | 25 | 35 | Within 1 s on time |
| Off state leakage current | Maximum ILeak | 1 A | I F = 0 m A | ||
| Turn on time* | T y p ic a l Ton | 0. 6 5 m s | 0 .2 3 m s | 0 .2 1 m s | I F = 5 m A |
| M a x im u m | 2 m s | 0 .5 m s | 0 .5 m s | I L = M a x . | |
| T ra n s fe r Turn off time* | T y p ic a l Toff | 0.08 ms | 0.04 | ms | I F = 5 m A |
| ch a ra c te ristics | M a x im u m | 0.2 ms | I L = M a x . f = 1 MHz | ||
| I/O capacitance | Maximum Ciso | 1.5 pF | VB = 0 V | ||
| Initial I/O isolation resistance | Minimum Riso | 1,000 M | 500 V DC |
特性曲线(Typical Performance Curves)

应用领域 Applications
获取报价 / 申请样品
常备现货、免费送样、支持小批量试产。报出用量与封装要求,当天给报价与交期。
销售直线(点击可直接拨打)📞0755-82811939点击拨打📞0755-82812373点击拨打📞0755-82811915点击拨打📞0755-82811193点击拨打企业 QQ(点击跳转对话)💬QQ 2850611261企业QQ 对接💬QQ 2355817597企业QQ 对接💬QQ 3002728093企业QQ 对接💬QQ 2355817598企业QQ 对接
手机端点号码直接拨号/唤起 QQ;电脑端点座机会唤起系统拨号应用,点 QQ 会打开企业QQ 对话窗口。
