产品实拍图


本页为博科信现货实拍(器件丝印 见规格书)。图片已加防盗水印,需要最新批次照片或未加水印原图请联系销售;点击图片可放大。
产品应用与封装尺寸

图纸取自原厂规格书,点击可放大查看原始尺寸标注。
关键参数速览
- 正向电流 IF
- 1.25 V (1.14 V
- 工作温度 TA
- 1
产品特点 Features
- 9.78 .252
- 1. Compact 8-pin DIP size 5. Low-level off state leakage current
- The device comes in a compact (W) 6.4 × of max. 1 µA
- (L) 9.78 ×(H) 3.9 mm (W) .252×(L) 6. Wide variation of load voltage 60V to
- .385×(H) .154 inch, 8-pin DIP size 600V
- (through hole terminal type).
- 2. Applicable for 2 Form A use as well as two independent 1 Form A use
- RoHS compliant
- TYPES
- Output rating*
- Load Load voltage current
- 60V 500 mA
- 100 V 300 mA
- AC/DC 200 V 160 mA dual use 350 V 120 mA
- 400 V 100 mA
- 600 V 40 mA
绝对最大额定值 Absolute Maximum Ratings(TA = 25°C)
超过下表数值可能造成器件永久损坏,设计时请留余量。
| 项目 | 符号 | AQW212(A) | AQW215(A) | AQW217(A) | AQW210(A) | AQW214(A) | AQW216(A) | 条件 |
|---|---|---|---|---|---|---|---|---|
| GU | 2 Form | A | (AQW21 ) |
数据来源:原厂规格书
安全与绝缘额定值(DIN EN/IEC 60747−5−5)
| 项目 | 符号 | AQW212(A) | AQW215(A) | AQW217(A) | AQW210(A) | AQW214(A) | AQW216(A) | 条件 |
|---|---|---|---|---|---|---|---|---|
| GU | 2 Form | A | (AQW21 ) |
电气特性 Electrical Characteristics(TA = 25°C)
| 项目 | 符号 | AQW212(A) | AQW215(A) | AQW217(A) | AQW210(A) | AQW214(A) | AQW216(A) | 条件 |
|---|---|---|---|---|---|---|---|---|
| LED operate | Typical | 0.9 | mA | |||||
| current | Maximum | 3 | mA | |||||
| LED turn off | Minimum | 0.4 | mA | |||||
| Input | IFoff | IL = Max. | ||||||
| current | Typical | 0.79 | mA | |||||
| LED dropout | Typical VF | 1.25 V (1.14 V | at IF = 5 mA) | IF = 50 mA | ||||
| voltage | Maximum | 1.5 | V | |||||
| Typical | 0.83 Ω | 2.3 Ω | 11 Ω | 23 Ω | 30 Ω | 70 Ω | IF = 5 mA | |
| On resistance | Ron | IL = Max. | ||||||
| Output | Maximum | 2.5 Ω | 4.0 Ω | 15 Ω | 35 Ω | 50 Ω | 120 Ω | Within 1 s on time |
| O ff s t a te leakage | Maximum ILeak | 1 | µA | I | F = 0 m A | |||
| Turn on time* Ty | p ic al Ton | 0. 6 5 m s | 0. 6 0 m s | 0 .2 5 m s | 0 .2 5 m s | 0 .3 1 m s | 0 .2 8 m s I | F = 5 m A |
| M | a x im um | 2 m s | 2 m s | 1 .0 m s | 0 .5 m s | 0 .5 m s | 0 .5 m s I | L = M a x . |
| Turn off time* T y | p ic al Toff | 0.08 ms | 0.06 ms | 0.05 ms | 0.05 ms | 0.05 ms | 0.04 ms I | F = 5 m A |
| Transfer M | a x im um | 0.2 | ms | I | L = M a x . | |||
| Typical | 0.8 | pF | f | = 1 MHz | ||||
| Maximum | 1.5 | pF | VB = 0 V | |||||
| Minimum Riso | 1,000 | MΩ | 500 V DC |
特性曲线(Typical Performance Curves)

应用领域 Applications
获取报价 / 申请样品
常备现货、免费送样、支持小批量试产。报出用量与封装要求,当天给报价与交期。
销售直线(点击可直接拨打)📞0755-82811939点击拨打📞0755-82812373点击拨打📞0755-82811915点击拨打📞0755-82811193点击拨打企业 QQ(点击跳转对话)💬QQ 2850611261企业QQ 对接💬QQ 2355817597企业QQ 对接💬QQ 3002728093企业QQ 对接💬QQ 2355817598企业QQ 对接
手机端点号码直接拨号/唤起 QQ;电脑端点座机会唤起系统拨号应用,点 QQ 会打开企业QQ 对话窗口。
