博科信光耦 BOKEXIN 博科信光耦BOKEXIN OPTOCOUPLER
首页 › 产品目录 › AQY210S

AQY210S 光继电器

反向电压 VR 5 V正向电流 IF 1.25隔离电压 VISO 500 V DC

产品实拍图

本型号暂无已核对的专属实拍图。为避免图文不符,本页不放同系列近似图;如需实物照片,请联系销售获取本批次实拍。

产品应用与封装尺寸

图纸取自原厂规格书,点击可放大查看原始尺寸标注。

关键参数速览

反向电压 VR
5 V
正向电流 IF
1.25
隔离电压 VISO
500 V DC

产品特点 Features

  • 4.3 4.4
  • CCAADD DDaattaa mm inch
  • TYPES
  • Output rating*
  • Load Load voltage current
  • 60V 500mA
  • AC/DC
  • 350V 120mA dual use
  • 400V 100mA
  • Indicate the peak AC and DC values.
  • closed-circuit offset voltage to enable • Measuring and testing equipment control of low-level analog signals without • Factory automation equipment distortion. • Security equipment
  • 2. Small SOP4-Pin package • High speed inspection machines
  • The device comes in a miniature SOP4- pin type measuring (W)4.3  (L)4.4 
  • (H)2.1 mm (W).169  (L).173  (H).083 inch
  • 3. Low-level off state leakage current of max. 1 A
  • 4. Load voltage 60V, 350V and 400V types available

绝对最大额定值 Absolute Maximum Ratings(TA = 25°C)

超过下表数值可能造成器件永久损坏,设计时请留余量。

符号AQY212SAQY210SAQY214S备注
IF VR50 mA 5 V
IFP Pin1 A 75 mWf = 100Hz, Duty factor = 0.1%
VL60 V350 V400 V
IL0.5 A0.12 A0.1 A PeakAC, DC
Ipeak Pout PT1.5 A0.3 A 300 mW 350 mW0.24 A 100ms(1 shot), VL = DC
GUSOP 1 FormA (AQY21S)
4. Turn off time vs. ambient temperature5. LED operatecurrent vs. ambient6. LED turn offcurrent vs. ambient
Continuous load current: Max. (DC)Continuous loadcurrent: Max. (DC)Continuous loadcurrent: Max. (DC)
sm,tnerruc,tnerruc
ffo nruTetarepoffo nrut
000
-40 -20 0 20 40 608085 -40 -200 20 40 60 8085-40 -200 20 40 60 8085
Ambient temperature,°CAmbient temperature, °CAmbient temperature, °C
temperature characteristicsoutput at MOSportionoutput at MOSportion
Ambient temperature:25C 77FAmbient temperature:25C 77F
Am 100 AQY210S
V ,egatlov 1.4,tnerruC 80 AQY214S 60A 0.4 AQY212S
1.2-5-4 -3 -2 -1-1-0.5
50mA1 2 3 4 50 0.5 1
DEL30mA-20 Voltage, VVoltage, V
1.120mA 10mA 5mA-40 -60 -100-0.2
-40 -20 0 20 40 608085-0.6
9. Off state leakage current vs. loadvoltage 10.Turn on timevs. LED forward current11.Turn off timevs. LED forward current
Ambient temperature: 25C 77FLoad voltage: Max.(DC); Continuous load current: AQY212SLoad voltage: Max. 0.10(DC); Continuous load current:
egakael 10-6,emit 0.8,emit 0.08
etats 10-9 ffOnruT 0.6 0.4ffo nruT 0.06AQY214S AQY210S
AQY214S, AQY212SAQY210S 0.2
AQY214S, AQY210S
0 20 40 60 80100 0 0 1020 30 40 50 600
0 1020 30 40 50 60
Load voltage, VLED forward current, mALED forward current, mA
Measured portion: between terminals 3and 4;
Frequency: 1 MHz; Ambient temperature:25C 77F
0 10 20 30 4050
ds_x615_en_aqy21s: 011212J3
数据来源:原厂规格书

安全与绝缘额定值(DIN EN/IEC 60747−5−5)

特性temperature特性2temperature2特性3
GUSOP 1 FormA (AQY21S)
4. Turn off time vs. ambient temperature5. LED operatecurrent vs. ambient6. LED turn offcurrent vs. ambient
Continuous load current: Max. (DC)Continuous loadcurrent: Max. (DC)Continuous loadcurrent: Max. (DC)
sm,tnerruc,tnerruc
ffo nruTetarepoffo nrut
000
-40 -20 0 20 40 608085 -40 -200 20 40 60 8085-40 -200 20 40 60 8085
Ambient temperature,°CAmbient temperature, °CAmbient temperature, °C
temperature characteristicsoutput at MOSportionoutput at MOSportion
Ambient temperature:25C 77FAmbient temperature:25C 77F
Am 100 AQY210S
V ,egatlov 1.4,tnerruC 80 AQY214S 60A 0.4 AQY212S
1.2-5-4 -3 -2 -1-1-0.5
50mA1 2 3 4 50 0.5 1
DEL30mA-20 Voltage, VVoltage, V
1.120mA 10mA 5mA-40 -60 -100-0.2
-40 -20 0 20 40 608085-0.6
9. Off state leakage current vs. loadvoltage 10.Turn on timevs. LED forward current11.Turn off timevs. LED forward current
Ambient temperature: 25C 77FLoad voltage: Max.(DC); Continuous load current: AQY212SLoad voltage: Max. 0.10(DC); Continuous load current:
egakael 10-6,emit 0.8,emit 0.08
etats 10-9 ffOnruT 0.6 0.4ffo nruT 0.06AQY214S AQY210S
AQY214S, AQY212SAQY210S 0.2
AQY214S, AQY210S
0 20 40 60 80100 0 0 1020 30 40 50 600
0 1020 30 40 50 60
Load voltage, VLED forward current, mALED forward current, mA
Measured portion: between terminals 3and 4;
Frequency: 1 MHz; Ambient temperature:25C 77F
0 10 20 30 4050
ds_x615_en_aqy21s: 011212J3

电气特性 Electrical Characteristics(TA = 25°C)

项目符号AQY212SAQY210SAQY214S备注
Typical0.9 mA
LED operate currentIFon Maximum3 mAIL = Max.
Minimum0.4 mA
Input LED turn off currentIFoffIL = Max.
Typical0.85 mA
Typical1.25V (1.14 V at IF = 5mA)
LED dropout voltageVF Maximum1.5 VIF = 50 mA
Typical0.83 17 25 IF = 5 mA
On resistanceRonIL = Max.
OutputMaximum2.5 25 35 Within 1 s on time
Off state leakage currentMaximum ILeak1 AI F = 0 m A
Turn on time*T y p ic a l Ton0. 6 5 m s0 .2 3 m s0 .2 1 m sI F = 5 m A
M a x im u m2 m s0 .5 m s0 .5 m sI L = M a x .
T ra n s fe r Turn off time*T y p ic a l Toff0.08 ms0.04msI F = 5 m A
ch a ra c te risticsM a x im u m0.2 msI L = M a x . f = 1 MHz
I/O capacitanceMaximum Ciso1.5 pFVB = 0 V
Initial I/O isolation resistanceMinimum Riso1,000 M500 V DC

特性曲线(Typical Performance Curves)

相关 / 可替代型号

以上型号来自规格书与型号命名比对,参数需以各自规格书为准;下单前请与销售确认封装与脚位。

应用领域 Applications

4.3 4.4GU SOP 1 Form A (AQY21S)0.5 5 5Am Am0.4 4 4 sm ,tnerruc ,tnerruc,emit0.3 3 3 ffo etarepo ffo nruT nrut0.2 DEL 2 DEL 2AQY212S0.1 1 1AQY214S, AQY210S0 0 0

资料下载

规格书为原厂公开资料,点击在新窗口打开下载。

获取报价 / 申请样品

常备现货、免费送样、支持小批量试产。报出用量与封装要求,当天给报价与交期。

销售直线(点击可直接拨打)📞0755-82811939点击拨打📞0755-82812373点击拨打📞0755-82811915点击拨打📞0755-82811193点击拨打企业 QQ(点击跳转对话)💬QQ 2850611261企业QQ 对接💬QQ 2355817597企业QQ 对接💬QQ 3002728093企业QQ 对接💬QQ 2355817598企业QQ 对接

手机端点号码直接拨号/唤起 QQ;电脑端点座机会唤起系统拨号应用,点 QQ 会打开企业QQ 对话窗口。

咨询此型号 · 现货询价

型号:AQY210S 请报型号与数量
销售电话(点击直接拨号)
📞0755-82811939拨打📞0755-82812373拨打📞0755-82811915拨打📞0755-82811193拨打📨 更多联系方式联系我们
企业 QQ(点击发起会话)
💬 QQ 2850611261点击会话💬 QQ 2355817597点击会话💬 QQ 3002728093点击会话💬 QQ 2355817598点击会话
营业时间:周一至周六 9:30 — 18:00
深圳市福田区华强北飞亚达大厦西座五楼501
1 / 1
滚轮缩放 · 拖动平移 · 点击图片放大 2 倍 · ← → 切换 · Esc 关闭